The first MS5001 Series (Frame 5) General Electric ® Turbines reached the field in 1957. 60 years and several upgrades and revisions later, hundreds of units continue operating in diverse environments across the globe. WWGTP can supply a wide range of Frame 5 Parts....
WWGTP’s scope of supply is not limited to just Gas Turbines. We can supply a wide range of Steam Turbine components as well. The examples shown below represent just a small sample of WWGTP’s sourcing capabilities. From control valve components to oil...
Recent Comments